Scheduled Maintenance - ZOLL thermogard xp Operation Manual

Hide thumbs Also See for thermogard xp:
Table of Contents

Advertisement

Scheduled Maintenance

The following table lists scheduled maintenance tasks for the System. Detailed
procedures for some of these tasks are listed later in this chapter.
Item
Coolant reservoir
Condensate pan
Refrigeration condenser
filter
Roller pump
Coolant
Power cord
Temperature accuracy
NOTE TO INFECTION CONTROL:
50% propylene glycol coolant has been evaluated for antimicrobial
effectiveness and determined not to promote growth of gram negative rods,
gram positive cocci, or yeast microbes. 50% propylene glycol was found to
be comparable to 70% isopropyl alcohol.
Table 8-1.
Scheduled Maintenance.
Frequency
Before each use
Inspect and refill with distilled water to
indicated line if necessary.
After each use
Inspect. Empty condensate if necessary (refer
to the "Clean Console and Condensate Pan"
section of this chapter).
Every 6 months
Inspect the filter and replace if necessary
(refer to the "Inspect/Replace Condenser
Filter" section of this chapter).
Monthly
Clean rollers and tubing path with cloth
moistened with water.
Clean rollers and apply light lubri-cating oil if
rollers have been in contact with saline
solution.
Annually
Drain and refill with new coolant mixture.
Annually
Inspect for wear or damage.
Annually
Perform a temperature accuracy test (refer to
the "Temperature Accuracy Test" section of
this chapter).
4
Maintenance
Maintenance Task
600479-001 Rev 2
134/147

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Coolgard 3000

Table of Contents