ABB Endura APA592 Operating Instruction page 60

Ph/redox orp transmitter
Table of Contents

Advertisement

Endura APA592
pH / Redox (ORP) transmitter
1-Point Manual Calibration
Step
Procedure
1
At the PV Manual Cal parameter select
the 1 Point Manual calibration option and
apply an input.
Wait for the message 'Continue When
Stable' to be displayed then press
the
2
Enter the new PV value using the
keys then press the
continue.
3
At the calibration results screen(s) check
the new values. Press the
the screen:
or
if a calibration failure message is
displayed, reset the PV value (see steps 1
and 2).
Table 7.2 1-Point Manual Calibration
58
key to continue.
key to
Screen
and
key to exit
7 Operator Pages and Menus
OI/APA592–EN Rev. E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents