Paramount Fitness Clear 03 Installation Manual page 11

For ozone pure water. water purifying system
Hide thumbs Also See for Clear 03:
Table of Contents

Advertisement

MAKING PLUMBING CONNECTIONS (CONT.)
2.4 Install the combination
needle valve flow meter on
the bottom of the Clear
®
unit. ( Fig. 12 )
O3
2.5 Install 3/8 OD x 1/4 ID
tubing to compression
end of check valve. ( Fig.
13 )
3. Pre-pump standpipe
installation: ( Fig. 14A & 13 )
3.1 Cut cap off standpipe.
3.2 Glue a 3/4" elbow and a
3/4" x 1/4" NPT
reducer bushing on end
of standpipe.
3.3 Install the threaded
end of the check
valve included in the
reducer bushing.
3.4 Install 3/8 OD x 1/4
ID tubing to barbed
end of check valve.
( Fig. 13 )
For technical assistance call 1.800.621.5886 or contact your regional representative
Fig. 12
Fig. 13
NOT TO SCALE
Fig. 14A
3/4" PIPE
3/4" PIPE
WATER LINE
11
2" PIPE
3/4" PIPE
WATER LINE
2" PIPE

Advertisement

Table of Contents
loading

Table of Contents