Making Plumbing Connections - Paramount Fitness Clear 03 Installation Manual

For ozone pure water. water purifying system
Hide thumbs Also See for Clear 03:
Table of Contents

Advertisement

1. Turn off power to the filtration
system pump at the circuit
breaker.
2. Pump strainer pot
installation: ( Fig. 10 )
2.1 Check pump elevation
above water level. Refer to
(Chart 1) for proper check
valve selection. The 0.5 lb
valve comes standard with
Clear O3
available to order
seperately.
2.2 Remove strainer pot plug. If
there is an O-Ring on plug
take O-Ring off of pot plug
and slide over threaded end
of check valve.
2.3 Wrap the check valve four
times with teflon tape and
install into the strainer pot
plug-hole. Add more tape
if valve does not seal.
( Fig. 11 )
For technical assistance call 1.800.621.5886 or contact your regional representative

MAKING PLUMBING CONNECTIONS

®
and others are
Fig. 10
Chart 1
Pump Elevation Above
Water Level
1' (30cm)
2' (60cm)
4' (120cm)
5' (150cm)
Fig. 11
10
Check Valve
Part Numbers
Rating
0.5 lb
005-402-1250-00
1.5 lb
005-402-2502-00
3.0 lb
005-401-2503-00
4.0 lb
005-401-2504-00

Advertisement

Table of Contents
loading

Table of Contents