Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17
Connecting CT cable of the power meter
1. Plug the CT cable into the CT connection on the
power meter.
P1E
P3E
2. Plug the CT cable into the plug of the measuring
sensors and lay the clamps for the measuring sen-
sors around the phase conductors (L for P1E; L1, L2
and L3 forP3E).
P1E
P3E
49