Page 1
Installation instructions Hybrid E5 Battery Storage System United Kingdom Europe...
Page 2
Delta Electronics (Netherlands) B.V. Tscheulinstraße 21 79331 Teningen Germany Authorized representative for this product in the EU: Delta Electronics (Netherlands) B.V. Zandsteen 15 2132 MZ Hoofddorp Netherlands Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
● All repair work on the inverter must be carried out by Delta Electronics. Otherwise, the warranty will be void. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Please observe the user information supplied with the battery. ● The battery box must always be replaced in its en- tirety. Separate replacement of the battery alone is not intended or allowed. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Freezer If the Smart Monitor is connected to the router, the Hybrid E5 System can be monitored and configured from a laptop. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 7
Washing machine connected directly to L1. If mains power is present, current is supplied to the plug connec- tor. In the event of mains failure, the plug Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
2 x DC negative, type: Phoenix Contact ??? MC4 plug for connecting the solar module, 2x DC positive, 2 x DC negative IP65 plug for communication cable between inverter and battery box AC plug Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Power is supplied via the inverter. 1 plug for RS485 1 DIN rail, 12.5 cm (incl. 2 screws for wall 2 mounting screws for fas- connection mounting) tening to the wall Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Switch on the Hybrid E5 System when no external Bypass switch power is supplied via the mains. Energy from the solar modules is used to start up the system. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 11
Warning, fault or failure. A corresponding message is shown on the display. The inverter is switched off = The AC/DC disconnecter is in the OFF posi- tion. Flashes Flashes Inverter is in Bootloader mode. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
4 STANDALONE Switch on the Hybrid E5 System when no external power is supplied via the mains. Energy from the bat- tery is used to start up the system. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 13
Blinking: Battery is currently charging hArGe iSChArGe Continuous light: Battery is currently discharging Additional LED status messages All three LEDs blink Update firmware All three LEDs are continuously illuminated Communication error Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Components of the system Power meter AC cable connection Current clamp(s) connection Reset button RS485 cable connection and RS485 termination resistor Status LED Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
4 Communication connection (CAN, RS485, +12 V sup- ply voltage) 5 Connection for external power supply (not included in the scope of delivery. Voltage is supplied via RS485.) Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
► The inverter is heavy. The wall has to be able to bear the heavy weight of the inverter. ► Always use the mounting plate supplied with the inverter. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
► Ensure sufficient air circulation. Hot air must be able to dissipate upwards. Leave enough space around the battery box. ► Note the operating temperature range. >100 cm >100 cm >100 cm Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Circuit diagram for 1-phase grids Inverter L’ N’ L’: 28 A max. (Stand Alone Module strings Battery box CAN-L CAN-H 485-B (–) 485-A (+) +12V Smart Monitor Router Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 19
L’ and N’ of the inverter. e mode: 15.7 A max.) L: 28 A max. TERM. 485 B (–) 485 A (+) 485 B (–) 485 A (+) Meter cabinet Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Circuit diagram for 3-phase grids Inverter L’ N’ L’: 28 A max. (Stand Alone Module strings Battery box CAN-L CAN-H 485-B (–) 485-A (+) +12V Smart Monitor Router Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 21
15.7 A max.) L: 28 A max. L1 L2 L3 TERM. 485 B (–) 485 A (+) 485 B (–) 485 A (+) Meter cabinet Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Dimensions Battery box Battery box dimensions: General dimensions Battery box dimensions: Drilling dimensions for floor mounting Battery box dimensions: Drilling dimensions for wall mounting Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Dimensions Power meter and Smart Monitor 63,3 85,6 47,3 69,6 66,5 P1E + P3E Dimensions of P1E and P3E power meter Smart Monitor dimensions Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Mounting Inverter 1. Drill mounting holes and insert anchors. 2. Screw the mounting plate in. 3. Mount the inverter on the mounting plate. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 26
4. Screw the inverter on the underside to the mounting plate using the 2 M6 screws. Additionally ground on the left side of the inverter housing (for equipotential bonding). Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 27
Mounting Inverter þ Mounting of the inverter is now complete. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Battery box - Floor mounting 1. Drill 4 mounting holes and insert anchors. Ansicht von unten 2. Screw the battery box to the floor on the left and right. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 29
Mounting Battery box - Floor mounting 3. Ground the battery box housing (for equipotential bonding). þ Floor mounting of the battery box is now complete. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
2. Screw the battery box on the underside to the mounting plate on the left and right using 3 M6 screws for each. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 31
Ensure that the battery box is mounted perpendicular. 4. Ground the battery box housing (for equipotential bonding). Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 32
Mounting Battery box - Wall mounting þ Wall mounting of the battery box is now complete. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
1. Attach the mounting plate to the wall using 2 M4 screws. The screws are supplied in the scope of delivery of the Smart Monitor. 2. Mount the power monitor on the mounting plate. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Mounting P1E and P3E Power meter Attach the power meter to the meter cabinet according to locally applicable regulations. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
5. Secure the rear housing section by tightening it using an M12 open-end wrench with 3 Nm of force. Re- verse with another M12 open-end wrench. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 36
1. Slide a flat screwdriver with a max. 3 mm blade into housing section. the unlocking opening of the plug connector and pull 5. Pull out the cable. out the plug with the charging cable. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 37
2. Push the red charging cable into the Battery+ con- nection and the black charging cable into the Bat- tery– connection on the left side of the battery box. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
1. Push one side of the CAN cable into the CAN con- nection on the inverter. 2. Push the other side of the CAN cable into the COMM connection on the battery box. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Data connection to Smart Monitor DATA– (RS485) ● External switch off (external device, connection is DATA+ (RS485) Data connection to P1E/ optional) P3E power meter DATA– (RS485) ● Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 40
VCC + INV OFF off, EPO) VCC + K1 Max. active power 0% VCC + K2 Max. active power 30 % VCC + K3 Max. active power 60 % Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Do not remove the rubber plugs from the unused seal feed-throughs. 4. Pull all required cables through the cable gland and seal. Retain the rubber caps removed in this process. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 42
Short circuit adjacent circuit diagram. Terminals V1 and K1 Terminals V1 and K2 Terminals V1 and K3 100% Terminals V1 and K4 Ripple control receiver Digital inputs Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
1 12V voltage supply for inverter (VCC and Gnd terminals) 2 dAtA+ and dAtA– for the inverter Connecting to router (optional) 3. Plug the network cable coming from the router into the LAN connection. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
1 Short circuit Terminals 1 and 2 to activate the RS485 termination resistor. 2 Connect DATA– to Terminal 5 (485 b (-)) and DATA+ to Terminal 6 (485 b (+)). Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
(RCMU) is certified in accordance with the power meter. VDE 0126 1-1/A1:2012-02 §6.6.2. Requirements for mains voltage The mains voltage range is 230 VAC ± 20%. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
2 = L’ (Load) 1 = L (Grid) 3 = N’ (Load) 4 = N (Grid) Wiring variants for the AC plug of the inverter Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 47
The first image shows the wiring for use of the Hybrid E5 system in isolated operation; the second image shows the wiring for use without isolated operation. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 48
6. Turn the AC/DC disconnecter on the inverter to the OFF position. 7. Plug the AC plug into the AC connection on the inverter and tighten. 8. Fasten the AC cable with a strain relief element. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
2. Plug the CT cable into the plug of the measuring sensors and lay the clamps for the measuring sen- sors around the phase conductors (L for P1E; L1, L2 and L3 forP3E). Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 50
Connecting CT cable of the power meter 3. Connect the AC cable to the power meter. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
► Observe the local regulations with ning the installation. regards to the protective caps. Mounting tool for disconnecting the DC plug and the protective caps from the DC connections. Available from Multi-Contact. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 52
1) Included in delivery Protective devices ► When selecting the necessary protective devices (e.g. fuses) take into account the Maximum reverse current of the solar modules. – – Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
O LED is continuously illuminated. 2 0 3 W H a u s N e t z 1 9 0 W Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
DC input connection type Multi-Contact MC4 Battery cable connection type Phoenix Contact PV-CF-S 6-16 and PV-CM-S 6-16 2x RS485, 1x dry contacts, 1x external power-off, 6x digital Communication interfaces inputs Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 55
AC voltage and frequency ranges are programmed according to the respectively applicable national regulations. If the specified current is exceeded, the inverter automatically switches off. If this happens, reduce the connected loads. Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
+10 ... +30 °C Maximum temperature range: ● Charging 0 ... +45 °C ● Discharging -10 ... +45 °C Relative humidity 0 ... 90%, non-condensing Certificates UN38.3 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Storage temperature range -20 ... +60 °C Relative humidity 30 ... 85%, non-condensing Dimensions 120 x 190 x 32 mm Weight 440 g Protection degree IP20 Safety standard Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 58
Space for notes Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Page 59
Space for notes Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17...
Need help?
Do you have a question about the Hybrid E5 and is the answer not in the manual?
Questions and answers