Power Meter: P1E Or P3E; R4E Smart Monitor - Delta Hybrid E5 Installation Instructions Manual

Battery storage system
Hide thumbs Also See for Hybrid E5:
Table of Contents

Advertisement

Power meter: P1E or P3E

Scope of supply, P1E only
1 single-phase power meter (to be
affixed to DIN rail)
1 x sensor cable for 1 current
clamp (2 m)
Scope of supply P1E and P3E
2 stoppers for power meter (to be
affixed to DIN rails)
1 plug for RS485
1 DIN rail, 12.5 cm (incl. 2 screws for wall
connection
Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17
1 current clamp
3 insulated cable lugs
mounting)
Scope of supply, P3E only
1 three-phase power meter (to be
affixed to DIN rails)
1 x sensor cable for 3 current
clamps (2 m)

R4E Smart Monitor

Power supply (not suitable for Germany).
Power is supplied via the inverter.
2 mounting screws for fas-
tening to the wall
Scope of supply
R4E Smart Monitor
3 current clamps
5 insulated cable lugs
9

Advertisement

Table of Contents
loading

Table of Contents