Installation clearances and air circulation
► Ensure sufficient air circulation. Hot air must be able
to dissipate upwards. Leave enough space around
the battery box.
► Note the operating temperature range.
>100 cm
Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17
Planning the installation
Battery box installation location
>100 cm
>100 cm
17