Tools for installation:
r Pipe wrench large enough
for a 2-inch pipe
r Premium quality Teflon
thread sealant
NOTE: We recommend
that you install an
external ball valve on
the cooling water inlet
of the Thermolator.
This valve is required
when the purge valve
option is installed.
Cooling water out
3-4
I
NSTALLATION
The Thermolator process inlets and outlets must be connected
to the plumbing that will circulate the temperature-controlled
water or fluid through the process. Cooling water inlets and
outlets are connected to the cooling water supply.
1
Remove the shipping pipe plug from the
female connections on the back of the Thermolator.
2
Install pipe to the rear of the Thermolator.
1 /
Use male 1
-inch NPT piping for process connections
4
3 /
and male
inch NPT piping for water connections. Pipe
4
and pipe threads must be clean and new. Clean threads
with solvent, removing all oil, grease and dirt. Allow the
threads to dry before proceeding.
3
Coat the pipe threads with thread sealant.
Follow the sealant manufacturer's directions.
4
Connect the male pipe to the appropriate
female connection on the back of the unit. Start by hand
until the threads engage, then use a pipe wrench to tighten
the connection only enough to prevent leaks. Do not over-
tighten!
From
process
To
process
Cooling water in
DIRECT INJECTION
Thermolator TW Series
Cooling water in
Cooling water out
To
From
process
process
CLOSED CIRCUIT
ISOLATED CIRCUIT
(BUT IN TALL CABINET)
UGH025-0504

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thermolator tw-2Thermolator tw

Table of Contents