10.5 COMMISSIONING RECORD LOG BOOK

B Enter your signature and the date after completing the start-up activities.
Start-up activities
1.
Filling and pressure testing the heating system.
• Pre-pressure expansion vessel (refer to the
installation instructions for the expansion vessel)
• Heating system filling pressure
2.
Write down the gas characteristics: Wobbe-index
3.
Checking for gas leaks
4.
Bleeding the gas flow pipe
5.
6.
Checking the appliance configuration
7.
Measuring the gas supply pressure (working pressure)
8.
9.
Carrying out a leakage check in operating conditions
10.
11.
Measure the ionisation current
12.
Boiler settings
13.
Closing and locking the boiler door
14.
Informing the user, handing over technical documents
Confirming proper commissioning
6 720 648 726 (2011/07)
Operating heat value
Measurement
Page
results
47
_____________bar
47
_____________bar
_____________kWh/m³
_____________kWh/m³
49
50
51
51
51
_____________mbar
51
_____________Pa/mbar
54
55
55
55
_____________μA
56
58
58
Company stamp/signature/date
COMMISSIONING
Remarks
59