Final Activities; Closing The Boiler Door And The Control Panel; Handing Over; Commissioning Record Log Book - Worcester GB162-50 Installation And Servicing Instructions

Commercial
Table of Contents

Advertisement

10.4

Final activities

10.4.1 Closing the boiler door and the control panel

▶ Close the boiler door and lock the fastener by turning the vent screw
through ¼ rotation in a clockwise direction.
Fig. 94 Closing the boiler door
10.5

Commissioning record log book

▶ Enter your signature and the date after completing the start-up activities.
Start-up activities
1.
Filling and pressure testing the heating system.
• Pre-pressure expansion vessel (refer to the installation instructions for the expansion vessel)
• Heating system filling pressure
2.
Write down the gas characteristics: Wobbe-index
3.
Checking for gas leaks
4.
Bleeding the gas flow pipe
5.
Checking the flue gas connection
6.
Checking the appliance configuration
7.
Measuring the gas supply pressure (working pressure)
8.
Checking and adjusting the gas/air ratio
9.
Carrying out a leakage check in operating conditions
10. Measuring the carbon monoxide content (CO), air free
11. Function testing
Measure the ionisation current
12. Boiler settings
13. Closing and locking the boiler door
14. Informing the user, handing over technical documents
Confirming proper commissioning
Table 19
6720813171 (2015/04)
▶ Push on the control panel to close it.
Fig. 95 Closing the control panel

10.4.2 Handing over

After completing the installation and commissioning of the system the
installer should hand over to the end user by the following actions.
▶ Hand over all relevant documentation to the end user and explain his/
6 720 648 726-095.1TD
her responsibilities under the relevant national and regional
regulations.
▶ Explain and demonstrate the starting and shutting down procedures.
Operating heat value
NOTICE:
▶ During initial start-up and annual servicing, make
sure that all control, regulating and safety devices are
in full working order and, if applicable, check for
correct adjustment.
▶ Always keep the user manual and installation and
servicing instructions by the boiler.
Measurement
Page
results
37
_________bar
37
_________bar
_______kWh/m³
_______kWh/m³
38
39
40
40
40
_______mbar
40
_______Pa/mbar
42
43
43
43
________μA
44
45
45
Company stamp/signature/date
Commissioning
6 720 648 726-044.1TD
Remarks
45