Worcester GB162-65 Installation And Servicing Instruction page 18

Wall hung gas fired condensing boiler
Table of Contents

Advertisement

DIMENSIONS OF BOILER
550
Fig. 7
Dimensions and connections WITH pump group (dimensions in mm)
1) The pump group is an accessory which has to be ordered separately.
CDO
Condensate drain outlet; Ø 24 mm O/D
CHF
CH (boiler) flow; G1½'' union nut with female thread
CHR
CH (boiler) return; G1½'' union nut with female thread
CS
Cap (DO NOT remove)
FGC/AIC
Flue gas/air intake connection: Ø 80/125 for GB162-65 and Ø 100/150 for GB162-80/100
GAS B
Gas connection to boiler; G1'' female thread
GAS P
Gas connection to pump group; Rp1'' female thread
PF
Pump group flow; G1½'' male thread, flat seal
PR
Pump group return; G1½'' male thread, flat seal
The servicing clearances required are:
• in front:
50 mm
• below:
0 mm (250 mm with pump group)
• right side:
0 mm
• left side:
0 mm
• above:
30 mm.
The position selected for installation MUST allow
adequate space for servicing in front of the boiler:
• in front:
550 mm
• below:
350 mm
• right side:
0 mm
• left side:
0 mm
• above:
40 mm.
18
6
465
0
152
AIC
FGC
1)
1)
35
PF/PR
138
162
CDO
520
0
AIC
FGC
300
CHF
GAS B
CHR
CDO
39
130
130
PF
GAS A
PR
CS
140
6 720 648 726 (2011/07)
6 720 648 726-007.1TD

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gb162-80Gb162-100

Table of Contents