Disconnect F9; Procedure - Landis+Gyr ZMQ202 User Manual

High precision metering
Table of Contents

Advertisement

Note
Note
4.7

Disconnect f9

4.7.1

Procedure

Direct connection
Landis+Gyr
52/88
8.
Disconnect the connecting wires of the supply inputs and outputs from
the spring clamp connectors as follows:
Withdrawing the wire
Withdrawing the wire with the terminal closed can damage the terminal.
Insert a size 1 screw-
driver, turning it slightly
upwards, into the
upper opening
Precautions on disconnected wires
The disconnected wires should be isolated and may also be numbered for
convenience when reconnecting.
9.
Unplug the ready-made telephone cables from modems and serial
interfaces.
The f9 can be directly connected or cable connected.
1.
Withdraw the meter from the rack.
Withdraw the wire from
the connector.
H 71 0200 0215 f en - ZMQ202 / ZFQ202 - User Manual
Withdraw the screw-
driver.
Installation / De-installation