Operation

WARNING: Ensure that all AC and DC wiring is correct. Check
that none of the AC and DC wires are pinched or damaged.
Be sure all the junction boxes are properly closed.

Basic MicroGT PV System Operation (w/ MagWeb GT)

To operate a battery-less MicroGT 500 inverter PV system:
1. Turn on the AC circuit breaker on each MicroGT inverter branch
circuit.
2. Turn on the main utility grid AC disconnect. The system will start
producing power after a fi ve-minute wait time (per UL 1741).
Note: Five minutes after turning on the AC circuit breaker, the
units' LEDs should start blinking green every 2 seconds. This
means they are producing power normally—however, they have
not yet connected to the MagWeb GT (if installed).
Additional Steps with an Installed MagWeb GT
3. Plug in the MagWeb GT and follow instructions per your MagWeb
GT Owner's Manual.
Once the MagWeb GT has been plugged in and acknowledges
the MicroGT inverters, the microinverters will start to blink
every 10 seconds.
Note: The time required for all microinverters in the system
to report to the MagWeb GT will vary with the number of
microinverters in the system. Once communications have been
established between the MagWeb GT and the microinverters, the
microinverters will start to send performance data over power
line to the MagWeb GT. You can verify the proper operation of the
MicroGT inverters via the MagWeb GT.
Refer to the MagWeb GT Owner's Manual for more information
on its operation.