Verify System Configuration - enphase ENV-S-WM230 Installation And Operation Manual

Hide thumbs Also See for ENV-S-WM230:
Table of Contents

Advertisement

8. Verify System Configuration

While still connected to Envoy-S with Installer Toolkit, check the Overview screen for the following:
a. Confirm that the expected number of devices are discovered and communicating.
b. On the Overview screen, check that the new profile is set on all the devices. This may take up to 5
minutes for a typical system.
c. Set up metering for the Envoy-S Metered (models ENV-S-WM-230 and ENV-S-WM1-230 only):
Tap the Meters button.
If there is a check
is shown, you must enable the meter:
Tap Production Meter. If the meter mode is Multiphase, you must select the
number of Phases Metered. This is based on how your Envoy-S is wired. For
example, if the Envoy-S is wired for three phases, select three phases.
Follow the on-screen instructions to enable the Production Meter.
If you installed consumption metering CT(s), tap Consumption Meter to enable the meter.
If the meter mode is Multiphase, you must select the number of Phases Metered.
The available options will match or exceed the value selected for the Production
Meter.
Based on where you installed the consumption CT, indicate whether the circuit that
passes through the consumption CT includes:
Follow the on-screen instructions to enable the Consumption Meter. If you change
the number of Phases Metered to exceed the number selected for the Production
Meter, the system increases the number for both meters and prompts you to
confirm.
Return to the Overview screen and verify the meter reading(s).
WARNING! If using consumption metering, be sure to set the meter type correctly. You
cannot change this setting once the meter is enabled.
If you used Installer Toolkit to detect devices, the Power Production LED
expected devices are producing power. If you did not use Installer Toolkit, it lights solid green if all
communicating devices are producing power. It flashes green when devices are upgrading. Check
Installer Toolkit for production status details. If the Power Production LED
"Power Production Issues" on page 36.
19
next to Production Meter, the production meter is enabled. If a gear
Load with solar production (net) or
o
Load only (total or gross), for example, in the case of a line-side tap.
o
© 2016 Enphase Energy Inc.
Envoy-S Metered Multiphase Installation and Operation
lights solid green when all
remains solid amber, see
141-00035 Rev 01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Envoy-s metered, multiphase

Table of Contents