enphase ENV-S-WM230 Installation And Operation Manual page 40

Hide thumbs Also See for ENV-S-WM230:
Table of Contents

Advertisement

11. Connect the Envoy-S to Enlighten as described in "9. Connect to Enlighten" on page 20.
12. Verify that the new Envoy-S Network Communications LED
minutes. If not, follow the network troubleshooting steps on page 36.
13. If possible, log in to Enlighten and add the Envoy-S to the Activation for this system by
clicking "Add Another Envoy" under the "Envoy" section.
14. Verify that the new Envoy-S starts discovering devices within 20 minutes of starting up. If
necessary, use the Enlighten or Device Scan button to start a new device scan during
daylight hours. (See "Initiate a New Scan for Devices" on page 25.)
NOTE: If the old Envoy-S has communicated to the microinverters on the same day that
the new replacement Envoy-S is installed, the new Envoy-S will be unable to discover the
microinverters. Contact Enphase at
in this situation.
15. Assess the power line communications by running a Communication Check from Enlighten
or the Installer Toolkit. If the communication check shows poor power line communications,
relocate the Envoy-S closer to the Switchboard.
16. Contact Enphase Support at
added to your system and to retire the replaced Envoy-S.
17. Ship the old Envoy-S to Enphase using the supplied RMA shipping label.
40
Envoy-S Metered Multiphase Installation and Operation
enphase.com/global/support-request
enphase.com/global/support-request
© 2016 Enphase Energy Inc.
lights green within five
for assistance
to have the new Envoy-S
141-00035 Rev 01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Envoy-s metered, multiphase

Table of Contents