Calibration; Replacement Parts; Fuse Replacement - GE PACE5000 User Manual

Pressure automated calibration equipment
Hide thumbs Also See for PACE5000:
Table of Contents

Advertisement

4 Maintenance
4.5

Calibration

The instrument should be returned to the manufacturer or calibration facility,
Goods /Material Procedure, Section
To find the date of the last calibration, press Measure set-up/Status/Calibration history.
4.6

Replacement Parts

Use only the replacement parts listed
WARNINGS
TURN OFF THE SOURCE PRESSURE AND CAREFULLY VENT THE PRESSURE LINES BEFORE
DISCONNECTING THE PRESSURE LINES FOR MAINTENANCE. PROCEED WITH CARE.
ISOLATE THE INSTRUMENT POWER SUPPLIES BEFORE REPLACING PARTS, WITH POWER
APPLIED THE INSTRUMENT CONTAINS LETHAL VOLTAGES.
Part number
-
-
IO-FILTER-KIT
CMX-XXXX †
refer to data sheet
4.7

Fuse Replacement

(Ref: Testing and Fault Finding, Section 5)
Remove
1. Set the power switch to OFF (if not rack-mounted got to step 3).
2. For access to rack-mounted instruments, the following actions maybe required:
a) Partially or completely withdraw the instrument.
b) Isolate pneumatic supplies.
c) De-pressurise all pressure supply inlet and output lines.
3. Isolate the power supply to the instrument and disconnect the IEC power supply connector (1).
4. Remove the fuse carrier (2) from the power supply input socket assembly.
5. Remove the fuse cartridge (3).
K0443 Revision A
6.12).
(Ref: Table 4.2, Replacement Parts
Table 4.2 - Replacement Parts List
Description
Fuse T2AH250V (PACE5000)
Fuse T5AH250V (PACE6000)
Kit, filter
Module, pressure control
(Ref: Figure 4.1 Fuse Replacement)
when to replace the fuse.
4 - 2
(Ref: Return
List).
[EN] English

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pace6000

Table of Contents