Calibration Process - GE ADTS 542 Instruction Manual

Air data test set
Table of Contents

Advertisement

Calibration process

The calibration process is PIN protected. This chapter describes the Ps and Pt sensor calibration. The
Tools, Calibration Sensor menu contains the calibration adjustment as part of the function Calibra-
tion check.
: Calibration checks must be performed within the calibration check menu because the main
NOTE
Ps/Pt measure display screen Pt reading includes an "Auto Zero" correction for any residual offset
error between the Ps and Pt sensors.
Precision
Precision is a term which includes the ADTS measurement system errors of non-linearity, hysteresis
and repeatability over the ADTS operating temperature range. Precision does not include errors intro-
duced by the equipment used for calibration of the ADTS or ADTS calibration stability errors as stated
on the ADTS data sheet.
ADTS542F
Pneumatic pressure
Table 4-1: Calibration requirements ADTS542F
Accuracy specifications(k =
2, 95% uncertainty)Includes:
NL, H and R over the ADTS
operating temperature
range and calibration
stability over 15 months*
and calibration equipment
uncertainty stated in Table
4-3
Ps Range:
92 mbar to 1130 mbar
absolute
Accuracy:
Refer to current product data
sheet
Pt Range:
92 mbar to 1997 mbar
absolute
Accuracy:
Refer to current product data
sheet
C
ALIBRATION PROCESS
Test method
Compared against calibration
standard
151

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adts 552Adts 553Adts 554f

Table of Contents