4.4

Installation of device

Procedure
Installation of energy calculator consists of five steps:
1. Check of application settings (Page 16)
2. Installation of energy calculator
3. Installation of temperature sensors (Page 21)
4. Electrical connection (Page 21)
5. Start-up
Installation in application
Depending on the selection via the order code, see Ordering instructions (Page 63), the
calculator is programmed for installation of the flowmeter in the hot line or cold line as
indicated on calculator type plate.
Typically, integrator is mounted on a wall or in a panel. The integrator should be installed in a
position that makes operation and service easy.
Wall mounting
The device is mounted using the wall bracket supplied (ambient temperature: max. 55°C
(131°F)).
Figure 4-1
SITRANS FUE950
Operating Instructions, 01/2010, SFIDK.PS.022.F4.02
Wall mounting of device
Installing/Mounting
4.4 Installation of device
17