Welch Allyn, Inc. Spot Vital Signs Service Manual
Revision A
1. Connect the unit to the test station by hooking up the pneumatic tubing, removing the battery and
connecting the power supply. Ensure that there are no obstacles in the way of the IR window.
2. Select Test|Pneumatic, and then the "Leak Test" option. The software will test for leak and will
give you a Pass or Fail indication.
3. Select the "Dump Test" option. The software will automatically test for the dump speed and will
give you a Pass or Fail indication.
4. Select the "Inflation Test" option. The software will automatically test for the inflation time and
give you a Pass or Fail indication.
5. Select "Valve Control Test" option. The software will automatically test to ensure that the unit
can control the valve and ensure that the valve is good.
6. Select "OK" to exit the dialog box.
Section 5.7 Pneumatic Tests
End of Section 5.7