Illustration 2.16 Pe Connection Between The Installation Box And The Electronic Part - Danfoss VLT FCD 302 Operating Instructions Manual

Decentral drive, frequency converter
Hide thumbs Also See for VLT FCD 302:
Table of Contents

Advertisement

Installation
CAUTION
PE CONNECTION
2
2
The metal pins in the corners of the electronic part and
the holes on the corner of the installation box are essential
for the protective earth connection. Make sure that they
are not loosened, removed, or violated in any way.
Tightening torque requirement is 3 Nm. See
Illustration 2.16.
Illustration 2.16 PE Connection between the Installation Box and
the Electronic Part
NOTE
The external grounding terminal is available as an
accessory (part no: 130B5833).
22
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
®
VLT
Decentral Drive FCD 302 Operating Instructions
®
MG04F302 - VLT
is a registered Danfoss trademark

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VLT FCD 302 and is the answer not in the manual?

Questions and answers

Table of Contents