Installation; Process Overview; Attach Mounting Bracket Or Hooks To Enb; Figure 4-1: High-Level Installation Process - Baicells Nova-243 eNodeB Installation Manual

High-performing outdoor micro base station
Hide thumbs Also See for Nova-243 eNodeB:
Table of Contents

Advertisement

Installation

4
Follow the guidelines and procedures in this section to prepare and install the cell site
equipment.

4.1 Process Overview

Figure 4-1 provides a high-level overview of the installation process. Note that you will
complete the basic connections and turn on the power to the eNB while it is still on the ground
to ensure it is operating properly before installing it at its final location on a tower, building, or
other structure.

Figure 4-1: High-Level Installation Process

4.2 Attach Mounting Bracket or Hooks to eNB

If you are going to install the eNB on a pole, you will use the mounting bracket specified in the
Shipping
List. If you are going to install the eNB on a wall, use the mounting hooks specified in
the
Shipping
List. Go to the appropriate section below for your installation.
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nova-243 enb

Table of Contents