Installation
4
Follow the guidelines and procedures in this section to prepare and install the cell site
equipment.
4.1 Process Overview
Figure 4-1 provides a high-level overview of the installation process. Note that you will
complete the basic connections and turn on the power to the eNB while it is still on the ground
to ensure it is operating properly before installing it at its final location on a tower, building, or
other structure.
Figure 4-1: High-Level Installation Process
4.2 Attach Mounting Bracket or Hooks to eNB
If you are going to install the eNB on a pole, you will use the mounting bracket specified in the
Shipping
List. If you are going to install the eNB on a wall, use the mounting hooks specified in
the
Shipping
List. Go to the appropriate section below for your installation.
20