Download Print this page

Installation Preparation; Supporting Materials; Installation Tools; Table 2-1 Support Materials - Baicells BRU35 Series Installation Manual

Outdoor lte tdd base station

Advertisement

Nova-243 Outdoor LTE TDD Base Station Installation Guide

2. Installation Preparation

2.1

Supporting Materials

Prepare the following support materials accordingly, as given in Table 2-1.
Item
Power cable
Power plug
Antenna RF cable
Ethernet cable
Antenna
Ground cable
2.2

Installation Tools

The following tools are needed during the installation.
Level bar
Percussion drill and
some drill heads
5mm L-shape allen
wrench

Table 2-1 Support Materials

< AWG16 e.g. AWG14
Shorter than 100m
The power plug connecting to the electricity supply.
50 ohm feeder
Outdoor CAT6
Shorter than 100m
Omnidirectional, or directional antenna
16mm² yellow-green wire
Marking pen
hammer
Cross
screwdriver
Ladder
Description
Knife
Vise
Cable vise
6
Wrench
Tape measure

Advertisement

loading

This manual is also suitable for:

Nova-243Bru3510