Installation Preparation

3

3.1 Personnel

Installing the base station on a tower, building, or other structure may require at least two
people or a tower crew. Installation personnel should follow standard safety precautions
concerning height, electricity, and other regulations. Baicells recommends that installation
personnel review this entire installation guide prior to beginning the installation.

3.2 Operator Network Design Plan

Installers should refer to the operator's network design plan for information about specific
network components, IP addressing, radio frequency (RF) coverage goals for the specific cell
site, and initial configuration settings.
Each cell site may be unique in terms of the type and number of components to install, the
coverage area, the user requirements, and so forth. Clearly identify the structure on which the
base station equipment will be installed, the intended height where the antenna and base
station will be attached, the degree of antenna down tilt, and other necessary specifications
that may impact the success of the installation.

3.3 Materials and Tools

Tables 3-1 and 3-2 describe the materials and tools required during the installation. Materials
may
be
purchased
https://na.Baicells.com/where-to-buy/. Match the frequency range of the antenna with the
base station. Consult

Table 3-1: Materials

Item
Ethernet Cable
Ground Cable
through
Baicells
regulatory rules
concerning output power specific to your location.
Description
Outdoor CAT6
Shorter than 330 feet (100 meters)
16mm² diameter yellow-green wire, minimum 14AWG
or
through
an
10
authorized
supplier: