Table 3-2: Operator-Supplied Tools
Level bar
Percussion drill
and drill heads
5mm L-shaped
Allen wrench
3.4 Computer and Software
As part of finishing the eNB installation process, you will need a computer to log in and verify
that the eNB status is reported as active by:
Using a local Ethernet connection to the eNB to access the GUI client application; or
•
•
Accessing the internet to reach the Baicells cloud-based Operations Management
Console (OMC).
3.5 Interfaces
The Nova-243 eNB interfaces are shown in Figure 3-1 and described in Table 3-3.
Marking pen
Hammer
Cross screw driver
Torx screw-
T7 screwdriver
driver
Knife
Pliers
Cable vice (crimper) Tape measure
Cable Stripper
head
15
Wrench