2. Installation Preparation

Supporting Materials

Prepare accordingly the following supporting materials, given as Table 2-1.
Table 2-1 Supporting Materials for Installing Base Stations
Item
Power line
Antenna feeder
Cable
Antenna
Ground wire

Installation Tools

The following tools are needed during the installation.
Level bar
Percussion drill and
some drill heads
5mm L-shape
socket head screw
wrench
< AWG16,e.g., AWG14
Shorter than 350m (1150 feet)
50 ohm feeder
CAT5, CAT5e
Omnidirectional, or directional antenna
16mm² yellow/green wire
Marking pen
hammer
Cross
screwdriver
Water-proof
Insulating tape
tape
Description
Knife
Vice
Cable vice
T7
screwdriver head
Wrench
Tape measure
Ladder
5