4.9 Power on the eNB to Check LEDs

With all components installed and connected locally, power on the eNB unit by plugging the
power cord into the electrical socket. With power applied, the LEDs should illuminate as shown
in Figure 4-16 and described in Table 4-1.

Figure 4-16: LEDs

Table 4-1: LED Descriptions

Identity
Color
ACT
Green
RUN
Green
ALM
Red
VSWR
Red

4.10 Install Equipment at Final Location

Installing the eNB should be performed only by qualified installation technicians following the
operator's network design plan and according to industry standard safety precautions.
Installation on a wall, roof, tower, or other structure may require a tower crew. Follow standard
safety precautions for working at the expected height and as required for electrical
installations. Always wear proper tower climbing safety gear and follow tower climbing safety
certification rules.
This section provides guidance on positioning the equipment on a wall or using a pole-mount
to place the equipment on a tower, roof, or other structure. Note that it does not matter if the
eNB or the antenna is installed first (or together at the same time).
Status
Steady On
OFF
Fast flash: 0.125s on,
0.125s off
Slow flash: 1s on,1s off
OFF
Steady On
OFF
OFF
Steady On
Description
The transmitting channel works
normally
The transmitting channel is not
working
The board is loading.
The board is normal.
No power input or faulty board
Hardware alarm, e.g., VSWR alarm
No alarm
The standing wave is normal.
The standing wave is larger than
normal.