LTE TDD Base Station Installation Guide
2. Installation Preparation
2.1
Support Materials
Prepare the following support materials accordingly, as given in Table 2-1.
Item
Power cable
Antenna RF cable
Optical fiber
Ethernet cable
Antenna
Ground cable
2.2
Installation Tools
The following tools are needed during the installation.
Level bar
Percussion drill and
some drill heads
5mm L-shape Allen
wrench
Table 2-1 Support Materials for Installing Base Station
< AWG16 e.g. AWG14
Shorter than 100m (330 feet)
50 ohm feeder
Single mode optical fiber
Outdoor CAT6
Shorter than 100m (330 feet)
Omnidirectional, or directional antenna
16mm² yellow-green wire
Marking pen
hammer
T7 screwdriver
head
Description
Knife
Cross screw
Cable vice
driver
Ladder
7
Vise
Wrench
Tape measure