V. Folding Rail Installation - Harmar Mobility Pinnacle SL600 Installation And Service Manual

Hide thumbs Also See for Pinnacle SL600:
Table of Contents

Advertisement

table of Contents
folding rail installation

V. FOLDING RAIL INSTALLATION

te!
A. RAIL INSTALLATION PREPARATION
TOOLS REQUIRED
The following is a suggested list of basic tools to have on hand during installation.
Wrenches
High torque drill
Allen wrenches (standard SAE set)
Carpenter's square
Pencil
Tape measure
INCLUDED PARTS
Before beginning folding rail installation, please inspect and check the box contents. Please note that the Pinnacle
Parts Box is omitted on new units since these parts are factory installed on the stair lift. Report any damage to
Harmar or the freight carrier.
Rail Box:
• Assembled Folding Rail
Track Bracket Box:
• Two (or more) assembled short track brackets, rack pieces, two adjustable feet
Pinnacle Parts Box:
• Folding track side-plate
• Screw
• Modified front and rear Pinnacle safety switch bumpers. For new units, this box is
omitted and these parts are already installed on the stair lift.

Advertisement

Table of Contents
loading

Table of Contents