Installation Site Electrical Requirements; Rail Installation - Harmar Mobility SL600HD Installation & Service Manual

Hide thumbs Also See for SL600HD:
Table of Contents

Advertisement

PINNACLE HD STAIR LIFT: SECTION 4
INSTALLATION
Do not cut the end of the rail that contains the joint
holes. Remove the charger strips and wire harness
before cutting.
Harmar offers a rail jig that allows holes to be drilled
in the end of a rail. Contact LiftSquad Support at
techservices@harmar.com
INSTALLATION
SITE ELECTRICAL
REQUIREMENTS
The lift must be connected to a dedicated 120V AC
15A electrical circuit.

RAIL INSTALLATION

1. Open the rail box and remove its contents.
2. Position the bottom rail (the rail with the end
plate attached) directly on the stairs with the
end plate towards the bottom of the stairs
and the plastic rack facing up. Place and object
that measures 1/2" between end plate and the
floor. See Figure 4-4.
NOTE: The minimum staircase
angle is 30° and maximum is
45°. Lift can accommodate
staircases with angles over 45°
up to 52° with a code variance.
NOTE: Use the chair box, or another heavy object, like a
toolbox, at the bottom of the rail to prevent it from sliding
down the stairs.
SL600HD PINNACLE STAIR LIFT:
8
25MAR2022 | 75403 E
NOTICE
Figure 4-4
Install Manual
3. Install two (2) splice bars into the end of the
track containing the splice pins. They will
each be secured by the "joint fasteners" (5/16"
flathead screws).
4. Position the two ends of the rail close
together. Locate and connect the plug on the
ends of the two power harnesses inside the
two rail pieces. See Figure 4-5.
Figure 4-5
5. With the plastic rack facing up, slide the top
into the bottom rail and guide them together
using the pre-installed pins. Gently tap on the
top rail if necessary to get them close
together. Be careful not to pinch the power
harness. See Figure 4-6.