ATTENTION! STRICT ADHERENCE TO THESE INSTALLATION INSTRUCTIONS is required and will promote the safety of those installing this
product, as well as those who will ultimately use the lift for its intended purpose. Any deviation from these instructions will void the
LIMITED WARRANTY that accompanies the product. Additionally, any party installing the product who deviates from the INSTALLATION
INSTRUCTIONS shall be taken to agree to INDEMNIFY, SAVE AND HOLD HARMLESS the manufacturer from any and all loss, liability or
damage, including attorneys fees, that might arise out of or in connection with such deviation.
P/N: 76015 RevE 72618

Advertisement

Table of Contents
loading

Summary of Contents for Harmar Mobility SL600FR-LH

  • Page 1 Stair Lift SL600 INSTALLATION MANUAL ATTENTION! STRICT ADHERENCE TO THESE INSTALLATION INSTRUCTIONS is required and will promote the safety of those installing this product, as well as those who will ultimately use the lift for its intended purpose. Any deviation from these instructions will void the LIMITED WARRANTY that accompanies the product.
  • Page 2: Table Of Contents

    Pinnacle Stair Lift CONTENTS Contents Read and understand this manual prior to attempting stair lift installations. Please refer to the Owner’s Manual for Limited PRELIMINARY CHECKS Warranty information and operating instructions. Tools Required ....... 3 The Owner’s Manual must be given to the owner of the lift before it is put into service.
  • Page 3: Preliminary Checks

    Pinnacle Stair Lift PRELIMINARY CHECKS Tools Required Rail Box: The following is a suggested list of basic tools to have on hand during installation. Bottom rail pre-installed with: Cordless drill Bottom end plate Allen wrenches (5/64", 5/32", 3/16", 5/16") Charge strip wire harness Bottom limit cam Phillips screwdriver (#3) Joint pins and joint brackets...
  • Page 4: Installation Procedures

    Pinnacle Stair Lift INSTALLATION PROCEDURES A. DETERMINE OVERALL RAIL LENGTH (Only if rail did not come pre-cut to length) 1: Determine any obstructions that will affect the position and length of the rail. These may include walls, doors, hallway orientation, etc. 2: Measure the overall length of the stairs from the nose at the top landing of the stairs to the floor at the bottom (nose to floor measurement, (128").
  • Page 5: Rail Installation

    Pinnacle Stair Lift INSTALLATION PROCEDURES B. RAIL INSTALLATION 1: Open the rail box and remove the contents. 2: Position the bottom rail (the rail with end plate attached) directly on the stairs with the end plate towards the bottom of the stairs and the plastic rack facing up.
  • Page 6 Pinnacle Stair Lift INSTALLATION PROCEDURES A. For double rails, the first rail bracket should be tightened in place so when turned over the back of the bracket touches the rear of the first step from the bottom landing. The second and third brackets should be placed and tightened on the steps on each side Figure 6-1 of the rail joint, again so the back of the...
  • Page 7: Chassis Installation

    Pinnacle Stair Lift INSTALLATION PROCEDURES C. CHASSIS INSTALLATION 1. Remove chassis from box. Lift the chassis with the manual override hole (on bottom) facing the downhill side of the stairs and gently slide the chassis onto the rail until it makes contact with the plastic rack.
  • Page 8: Final Rail Installation

    Pinnacle Stair Lift INSTALLATION PROCEDURES D. FINAL RAIL INSTALLATION 1. Install the remaining plastic rack pieces in the upper rail. [Figure 8-1] 2. Use a hacksaw or chop saw to cut the last plastic Figure 8-1 rack piece flush with the rail end. Place something on the floor to catch debris or mark and cut the rack outside.
  • Page 9 Pinnacle Stair Lift INSTALLATION PROCEDURES 5. Install the end plate to the top of the track with the four (4) self-cutting Torx screws using the supplied T30 Torx bit. [Figure 9-1] Too much torque applied to these screws Figure 9-1 may result in damage.
  • Page 10: Footrest And Seat Installation

    Pinnacle Stair Lift INSTALLATION PROCEDURES E. FOOTREST & SEAT INSTALLATION 1. Remove footrest from box and use the installation switch to drive the chassis downward to a position about 6" clear of the floor. This will provide a safe area to install and adjust the footrest. Do not drive the unit into bottom stop.
  • Page 11 Pinnacle Stair Lift INSTALLATION PROCEDURES When the 6-pin footrest and/or the 8-pin chair cables are connected to the chassis, the black installation switch on the chassis is disabled and will not function. 10. Connect the seat cable to the 8-pin connector Figure 11-1 on the chassis.
  • Page 12 Pinnacle Stair Lift INSTALLATION PROCEDURES F. LED & AUDIBLE TONES 1. If the LED indicator light is not green, check the safety senors: Figure 12-1 Seat swivel sensor (seat should be in the • locked position) 2. TONES INFORMATION Footrest lower sensor (check by pushing in •...
  • Page 13: Remote Control Operation

    Pinnacle Stair Lift REMOTE CONTROL OPERATION Remote Call/Send Control Operation A. REMOTE CONTROL OPERATION ensuring that the polarity is correct. B. REMOTE CONTROL RE-PROGRAMMING NOTE - If the key lock option is installed the key switch on the arm of the chair must be in the “ON” All call/send controls are factory programmed.
  • Page 14: Completion Procedures

    Pinnacle Stair Lift COMPLETION PROCEDURES Completion Procedures 2. The final stopped position can be adjusted to accommodate the height of the user by repositioning the limit cam located in a slot in the rail. A. TEST ARMREST CONTROL SWITCH 3. Use a 5/64" Allen wrench to loosen the set screw 1.
  • Page 15: Additional System Checks

    Pinnacle Stair Lift COMPLETION PROCEDURES 7. Test to ensure that the lift can only be driven 5. Test the seat swivel at the top by using the levers away from the obstruction. The LED indicator light and swiveling the seat towards the landing and will turn to green and stop beeping indicating a safe stop the seat at 35 and 85 degrees.
  • Page 16: Folding Rail Installation

    Pinnacle Stair Lift FOLDING RAIL INSTALLATION Folding Rail Option Installation Note - The photos in this section show a "left" folding rail, assembled to be installed on the left side of the stairway. If you’re assembling a "right’"side, please complete all of these steps in mirror-image to what’s shown.
  • Page 17 Pinnacle Stair Lift FOLDING RAIL INSTALLATION 4. Place the rail onto the stairway with the bottom bracket on the second step, as shown. Note that the bottom feet should approximately rest on the floor with the rail straight, but they will be adjusted later. [Figure 17-1] Figure 17-1 5.
  • Page 18 Pinnacle Stair Lift FOLDING RAIL INSTALLATION 7. Fasten down the near corner of the lower bracket using a drill that has extensions at least 10" long and a 3/8" socket. [Figure 18-1 & 18-2] 8. Measure from the side of the rail at the upper bracket of the folding rail.
  • Page 19 Pinnacle Stair Lift FOLDING RAIL INSTALLATION 12. Reinstall the two plastic caps on the feet to cover the threads. [Figure 19-1] 13. Carefully move the fork with your hand to make sure it operates smoothly. Allow it to go all the way to the floor.
  • Page 20 Stair Lift SL600 www.harmar.com | 800-833-0478 INSTALLATION MANUAL 2075 47th Street Sarasota, Florida 34234 P/N: 76015 RevE 72618...