Folding Rail Option Installation
Note - The photos in this section show a "left" folding rail, assembled to be installed on the left side of
the stairway. If you're assembling a "right'"side, please complete all of these steps in mirror-image to
what's shown.
As always, if you encounter any difficulty, please call Harmar Technical Support at:
FOLDING RAIL INSTALLATION PROCEDURES
1. Orient the two rail brackets onto the folding rail
as shown [Figure 16-1], with the nuts on the same
side as the folding mechanism (for either left or right
folding). [Figure 16-2]
2. Expand and snap the two brackets over the rail,
so the top is in the bracket-groove. [Figure 16-3]
3. Partially tighten the two nuts that position
these on the rail, using a 1/2" wrench (deep socket
preferred), so they won't slide when you're test-
fitting the position. [Figure 16-4]
16

FOLDING RAIL INSTALLATION

| www.harmar.com
(866) 351-2776
Figure 16-1
Figure 16-2
Figure 16-3
Figure 16-4