Installation
2.5

Power-up Self Test

Info: All power to operate the remote control is provided by the inverter/charger
through the remote cable.
When the ME-ARC is first connected to an inverter, a power-up self test is initialized. During the
self test, the LCD automatically displays in sequence:
The remote's LEDs also change with the screens (see Figure 2-7).
No LEDs light
PWR lights green
FAULT lights red
CHG lights green
INV lights green
CHG lights green
INV lights green
After the self test is fi nished the remote displays "Set Clock". Use the ARC's SELECT knob to set
the correct time by selecting hour, minutes, and either AM or PM (see Figure 2-8 below, and the
Set Clock procedure on page 19). Once the ARC's clock is set, the inverter Home screen displays.
Set Clock
Hour
=
11:18A
Page 7
"MAGNUM ENERGY Self Test", then
"(C)2010-2013, Connecting to...", and then
"ME-ARC V 4.0, INV/CHG V #.#"
PWR
FAULT
CHG
INV
PWR
FAULT
CHG
INV
PWR
FAULT
CHG
INV

Figure 2-7, Power-up Self Test Screens

Set Clock
Minute =
Inverter Home screen

Figure 2-8, Self Test Set Clock Screens

MAGNUM ENERGY
Self Test
(C)2010-2013
Connecting to..
ME-ARC V 4.0
INV/CHG V #.#
11:18A
[Inverter Status]
DC
12.6V
100A
© 2014 Magnum Energy, Inc.
Set Clock
AM-PM
=
11:18A