GE N60 Instruction Manual page 122

Network stability and synchrophasor measurement system ur series
Hide thumbs Also See for N60:
Table of Contents

Advertisement

4.3 FACEPLATE INTERFACE
2.
Slide the label tool under the LED label until the tabs snap out as shown below. This will attach the label tool to the LED
label.
3.
Remove the tool and attached LED label as shown below.
4
4.
Slide the new LED label inside the pocket until the text is properly aligned with the LEDs, as shown below.
The following procedure describes how to remove the user-programmable pushbutton labels from the N60 enhanced front
panel and insert the custom labels.
4-20
N60 Network Stability and Synchrophasor Measurement System
4 HUMAN INTERFACES
GE Multilin

Advertisement

Table of Contents
loading

Table of Contents