Install the setting plate [1] while aligning its cut-out with
the tab on the IACV.
Install and tighten the IACV setting plate torx screws [2]
to the specified torque.
TORQUE:2.1 N·m (0.2 kgf·m, 1.5 lbf·ft)
Connect the IACV 4P (Black) connector [3].
Install the fuel tank (page
7-7).
SECONDARY AIR SUPPLY SYSTEM
SYSTEM INSPECTION
Start the engine and warm it until the coolant
temperature is 80 °C
(176°F).
Stop the
engine.
Disassemble the air cleaner housing (page 7-11 ).
Check that the secondary air intake port [1) of the
element holder is clean and free of carbon
deposits.
Check the PAIR check
valve
if the port is carbon fouled
(page
7-24).
Start the engine and open the throttle slightly to be
certain that air is sucked in through the air supply hose.
If the air is not drawn in, check the air supply hoses [1]
for clogs and PAIR control solenoid
valve
[2] (page 7-
24).
[2]
<===1
FRESH AIR
. - EXHAUST GAS
FUEL SYSTEM
7-23