Apply Power To The Pump; Pump Tubing Installation - Hach QC8500 Series 2 User Manual

Fia automated ion analyzer
Table of Contents

Advertisement

Installation

3.2.2 Apply power to the pump

1
Power switch

3.2.3 Pump tubing installation

1
Cartridge
18
To apply power to the pump:
1. Turn on the power strip, then turn on the power switch on the back of the pump
(Figure
14). In an RP-150 Model pump, the top panel will show the set speed of 35.
Figure 14 Power switch location
To install the pump tubing:
1. Remove all of the pump cartridges. Press the cartridge holder against the pump, then
lift the cartridges out
Figure 15 Pump cartridge removal
(Figure
15).
2
Cartridge holder

Advertisement

Table of Contents
loading

Table of Contents