Disassembly, Inspection, Repair, And Assembly Of Lifting Ring - Baudoulin 4M11G Maintenance Manual

4m11 series diesel engine for land power generators
Table of Contents

Advertisement

Maintenance Manual of 4M11 Series Diesel Engine For Land Power Generators

4.2.5 Disassembly, Inspection, Repair, and Assembly of Lifting Ring

4.2.5.1 Exploded View for Assembly of Lifting Ring
4.2.5.2 Lifting Ring DisassemblyProcedures
After disassembling the covering part of lifting eye bolts, loosen and disassemble the
lifting eye bolts.
4.2.5.3 Inspection and Maintenance of Lifting Ring
Check the external surface of lifting eye bolts and the threaded holes for presence of
cracking. If any, replace with new ones.
4.2.5.4 Lifting Ring Assembly Procedures
The assembly procedures are in the reverse order of the disassembly procedures.
2- Cylinder head bolt
Figure 4-8 Exploded View for Assembly of Lifting Ring
1- Lifting ring
42 

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 4M11G and is the answer not in the manual?

Related Products for Baudoulin 4M11G

Table of Contents