Completing The Installation Checklist - Eaton Powerware 9315 UPS Powerware 9315 Installation And Operation Manual

500–750 kva
Hide thumbs Also See for Powerware 9315 UPS Powerware 9315:
Table of Contents

Advertisement

INSTALLING THE UPS SYSTEM
3.9

Completing the Installation Checklist

The final step in installing the UPS system is completing the following installation
checklist. This checklist ensures that you have completely installed all hardware,
cables, and other equipment. Completing all items listed on the checklist will ensure a
smooth installation. You should make a copy of the installation checklist before filling
it out, and retain the original.
After the installation is complete, a service representative will be able to verify the
UPS system operation and commission it to support the critical load. The service
representative cannot perform any installation tasks other than verifying software and
operating setup parameters. Service personnel may request a copy of the completed
installation checklist to be sure you have completed all applicable equipment
installation.
NOTE The installation checklist MUST be completed prior to starting the UPS system for the first time.
S
3-7
EATON Powerware
®
9315 UPS (500–750 kVA) Installation and Operation Manual
164201244 Rev E www.powerware.com

Advertisement

Table of Contents
loading

Table of Contents