2.2. Dismantling of Transport Beams and Machine Alignment

Install the machine with a pallet truck exactly on the required working site. Unscrew the bolts holding the machine and the transport
beams together. Using the pallet truck, lift the machine above the transport beams. Keep the machine alignment so that it does not
overbalance to either side. Remove the transport beams. Screw the four supplied bolts M12 x 150 in the holes, in which the transport
bolts were screwed in, until they touch the floor. Tightening the bolts slowly, lift the machine above the pallet truck. Do not
lower the machine with the pallet truck on the bolts. This could cause the bending of the bolts. Remove the pallet truck
outside the machine. Loosening the bolts step by step, lower the machine to the floor. Remove the M12 x 150 bolts and replace them
with the M12 x 30 bolts and nuts supplied with the unit. Using these bolts, align the machine in horizontal position and lock the bolts
with nuts. Remove rust protection and dust from the sliding surfaces and apply oil again. Ensure electrical connection (see item
2.4.). Open the door in the machine base and check whether the coolant hose has not become loose during transport and is in its
place. Fill the machine tray with coolant (approx. 35 liters); the coolant will slowly flow in the container in the base.
Hazards due to dangerous substances cannot be excluded while coolants are handled. Be sure to
observe in your own interest the national regulations and recommendations /operating instructions of
the manufacturer and/or your company concerning safe handling of coolants.

2.3. Machine Installation

The machine must be protected against humidity, rain and dust!
The machine may be operated in the ambient temperature between + 5°C and + 40°C. The average air temperature must not
exceed +35°C over the period of 24 hours. In temperatures lower than +5°C, the conventional coolants should be replaced with
coolants designed for particular temperatures.

2.4. Connection to Energy Supplies

Make sure that the network voltage, the voltage protection and the AC-side voltage comply with the requirements concerning power
given in item 3. Technical Data. When connecting the machine to the mains 3NPe 50Hz, 400V, TN-S, consequently follow the
color marking of the conductors: L1 black, L2 brown, N blue, PE yellow/green. Incorrect connection of the zero conductor or
PE conductor can cause damage to electric equipment of the machine or electrical shock! The feeder cable of electric power
of the machine should be connected to a 16 A protected socket; in case of the direct connection to the line, the lead must be provided
with a lockable master switch. If the motor rotates in incorrect direction, interchange the conductors L1 black and L2brown on the
machine lead.
Failure to follow the a.-m instructions causes the band saw drive and the coolant pump
run in incorrect direction. The machine could be damaged!
This kind of work may be carried out only by electrically qualified persons!