Decommisioning - WAGNER ZIP52 Finishing Operating Manual

Pneumatic double diaphragm pump spray pack
Hide thumbs Also See for ZIP52 Finishing:
Table of Contents

Advertisement

VERSION 12 / 2012
OPERATING MANUAL
9.8

DECOMMISIONING

When the equipment must be scrapped, please diff erentiate the disposal of the waste
materials.
The following materials have been used:
Steel
Aluminium
Elastomerics
Plastics
Carbide
The consumable materials (paints, adhesives, sealers, solvents) must be disposed of
according to the valid specifi c standards.
ORDER NUMBER DOC 2332848
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zip52 pf eco-finishing

Table of Contents