VERSION 12 / 2012
OPERATING MANUAL
The ground connection is imperative.
B_04049
Procedure:
1. Remove the crimp connection delivered with the pump.
2. Crimp the grounding cable on the terminal and screw it back onto the pump's foot.
3. Ground the material/paint container to a local ground connection.
4. Ground the other parts of the system to a local ground connection.
ORDER NUMBER DOC 2332848
28