WAGNER ZIP52 Finishing Operating Manual page 26

Pneumatic double diaphragm pump spray pack
Hide thumbs Also See for ZIP52 Finishing:
Table of Contents

Advertisement

VERSION 12 / 2012
OPERATING MANUAL
Material connection:
Connect the suction hose (on the underside) and the paint/air double hose to the
corresponding connections.
Note: Make sure that the color hose does not get mixed up with the air hose, as the
connections are the same size.
Connect a suitable air spray gun to the other end of the double hose.
For pumps installed in areas subject to explosion hazards, all hoses and pipes must be
made of conductive material and must be grounded.
All hoses and components connected to the supply line must be able to operate at the
pump's maximum pressure with the pump working at a pulsating pressure.
Compressed air supply connection:
Connect the unit's air inlet fi ttings to the distribution network.
Caution: The connection must be carried out on the pump's fi tting. Do not replace the
original fi tting.
Use a pipe with a suitable diameter for the connection.
Provide an external air cut-off valve for the ZIP52 PF Eco-Finishing.
The pressure must not exceed the maximum value indicated on the type plate.
Air pressure quality:
The unit must be fed with clean and dry industrial air. Make sure effi cient fi lter and
condensation separation systems are installed on the air line.
The pump can be run with non-lubricated air.
Air pressure quality: 5.5.4 = 40 μm / +7 / 5 mg/m³
Reversing valve:
The reversing valve of the pump is lubricated at the factory and does not need any
lubrication.
Safety valve:
The ZIP models are equipped with an internal safety valve that opens if the maximum
allowed value of air pressure supply is exceeded.
ORDER NUMBER DOC 2332848
26

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zip52 pf eco-finishing

Table of Contents