Lightning Protection; Overview; Recommended Additional Components For E1/T1 Installation; Table 19: Protection Requirements - Motorola Canopy 300 Mbps Backhaul User Manual

Table of Contents

Advertisement

16.6 Lightning Protection

16.7 Overview

Chapter 12 in the main body of this manual contains the requirements for the 150/300 Mbps
Backhaul deployment. This section details the additional requirements for the deployment of
E1/T1.

16.8 Recommended Additional Components for E1/T1 Installation

The recommended components below are in addition to those listed in section 10, the extra
components required for the E1/T1 installation are:
Screened (Shielded) Cat 5 Cable
Surge Arrestor Units — Transtector type ALPU-ORT, 4 required per link.
www.transtector.com
RJ45 screened connectors
10 AWG Grounding Cable
For a description of Zone A and Zone B refer to section 10.
Surge Arrestor Unit ALPU-ORT at ODU
Ground (Earth) Cable at Building Entry
Surge Arrestor Unit ALPU-ORT at
Issue 1.1 April 2006
)
Ground (Earth) ODU
Screen Cable
Building Entry

Table 19: Protection Requirements

Zone A
Zone B
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Page 157

Advertisement

Table of Contents
loading

This manual is also suitable for:

Canopy 150 mbps backhaul

Table of Contents