Avaya C360 Manager User Manual page 124

Integrated management 3.0
Table of Contents

Advertisement

Chapter 7
110
Table 7-9. USP Configuration - Advanced Parameters (Continued)
Field
DSR
DTR
RTS
CTS
Invert Tx Clock
Description
The port's Data Set Ready status. Possible values
are:
• Up - The port's data set has successfully
been prepared. This process takes place
during initial line signalling.
• Down - The port's data set has either
failed preparation or has completed the
preparation process.
The port's Data Terminal Ready status. Possible
values are:
• Up - The port is physically prepared to
transmit and receive packets.
• Down - The port is not physically
prepared to transmit and receive packets.
This generally indicates an error condition
on the circuit.
The port's Ready To Send status. Possible values
are:
• Up - The port is logically prepared to
transmit and receive packets.
• Down - The port is not logically prepared
to transmit and receive packets. This
generally indicates an error condition
either on the device or the circuit.
The port's Clear To Send status. Possible values
are:
• Up - The port has successfully completed
initial line signalling. CTS takes place at the
end of the initial line signalling process and
last for a short period of time.
• Down - The port has either failed to
complete initial line signalling or the initial
line signalling process has been completed.
The state of the Tx clock. Possible states are:
• On - The Tx clock is inverted.
• Off - The Tx clock is not inverted.
Avaya C360 Manager User Guide

Advertisement

Table of Contents
loading

Table of Contents

Save Article as PDF