Mitsubishi Electric PUHY-RP-Y(S)JM-B Data Book page 201

Table of Contents

Advertisement

1. Electrical work
The local standards and/or regulations is applicable at a higher priority.
1-4-2. PUHY-RP400-650YSJM-B
<In the case a system controller is connected.>
Note12
SC
Connector
CN41 CN40
OU
Note4
LW
TB1
TB3
(L1,L2,L3,N)
(M1,M2)
(M1,M2)
GFI
WB
Power supply
3-phase 4-wire
380-400-415V 50/60Hz
Note10,13
Note3
To *1 or *2
*1
(Using MA remote controller)
Connecting TB5 terminal.
LW
>=dia.1.6mm
GFI
WB
Power supply
1-phase
220-240V 50/60Hz
Note10
* Power supply
specifications vary with
the model of connected
indoor units
Indoor-outdoor
transmission cable
2
>=1.25mm
Shield cable
*2
(Using ME remote controller)
Connecting TB5 terminal.
LW
>=dia.1.6mm
GFI
WB
Power supply
1-phase
220-240V 50/60Hz
Note10
* Power supply
specifications vary with
the model of connected
indoor units
Indoor-outdoor
transmission cable
2
>=1.25mm
Shield cable
Symbol
GFI
Ground-fault interrupter
LW
Local switch
BC
Breaker capacity
OCP
Over-current protector
WB
Wiring breaker
NFB
Non-fuse breaker
OU
Outdoor unit
IU
Indoor unit
SC
System controller
MA R/C
MA remote controller
ME R/C
ME remote controller
Centralized control
transmission cable
2
>=1.25mm
Shield cable
(CVVS, CPEVS
MVVS)
Note4
To other OU
TB7
LW
(L1,L2,L3,N)
GFI
WB
TB7
(S)
Power supply
3-phase 4-wire
380-400-415V 50/60Hz
Note10,13
>=dia.1.6mm
TB2
TB2
TB5
TB15
TB5
TB15
(L,N)
(L,N)
(M1,M2)
(1,2)
(M1,M2)
(1,2)
S
S
IU
(Shield)
(Shield)
MA R/C
MA R/C
>=dia.1.6mm
TB2
TB2
TB5
TB15
TB5
TB15
(L,N)
(L,N)
(M1,M2)
(1,2)
(M1,M2)
(1,2)
S
S
IU
(Shield)
(Shield)
Note6
Note7
ME R/C
ME R/C
Model
Ground-fault interrupter
*1, *2
PUHY-RP200YJM
30A 100mA 0.1sec. or less
PUHY-RP250YJM
30A 100mA 0.1sec. or less
PUHY-RP300YJM
30A 100mA 0.1sec. or less
PUHY-RP350YJM
40A 100mA 0.1sec. or less
*1 The Ground-fault interrupter should support Inverter circuit. (e.g. Mitsubishi Electric's NV-C series or equivalent).
*2 Ground-fault interrupter should combine using of local switch or wiring breaker.
*3 It shows data for B-type fuse of the breaker for current leakage.
SYSTEM DESIGN
Note:
1 The transmission cable is not-polarity double-wire.
2 Symbol
3 The shield wire of transmission cable should be connected to the grounding terminal at
Outdoor unit. All shield wire of M-Net transmission cable among Indoor units should be
connected to the S terminal at Indoor unit or all shield wire should be connected together.
The broken line at the scheme means shield wire.
4 When the Outdoor unit connected with system controller, power-supply to TB7 of the
outdoor unit(s) is needed. The connector change from CN41 to CN40 at one of the
outdoor units will enable the outdoor unit to supply power to TB7, or an extra power
supplying unit PAC-SC51KUA should be used. The transmission cable (above 1.25mm
shielded, CVVS/CPEVS/MVVS) among Outdoor units and system controllers is called
OU
centralized control transmission cable. The shield wire of the centralized control
transmission cable must be grounded at the Outdoor unit whose CN41 is changed to
CN40.
5 MA R/C transmission cable (0.3-1.25mm
R/C transmission cable (0.3-1.25mm
TB1
TB3
TB7
cable to the ME R/C can be extend using a M-NET cable (>=1.25mm
(M1,M2)
(M1,M2)
is counted in the M-Net length. Both Compact MA and ME R/C transmission cables size
0.75~1.25mm
TB7
6 MA remote controller and ME remote controller should not be grouped together.
(S)
7 If using 1 or 2 (main/sub) MA remote controller to control more than 1 Indoor unit, use MA
transmission cable to connect all the TB15 terminals of the Indoor units. It is called
"Grouping".
If using 1 or 2 (main/sub) ME remote controller control more than 1 indoor unit, set
address to Indoor unit and ME remote controller. For the method, refer to 2-4. "Address
Setting".
Note3
8 Indoor board consumes power from TB3. The power balance should be considered
according to System Design 2-3 "System configuration restrictions".
9 If Transmission booster is needed, be sure to connect the shield wires to the both sides
to the booster.
10 The critical current for choosing power source equipment is approximate
1.4 times of total rated current of the Outdoor unit(s) or Indoor unit(s).
11 Numbers shown with ( ) indicates a diameter of the compact remote controller.
12 When System controller (SC) is connected to the system, turn the SW2-1 on.
13. The phases of electricity power must be confirmed to be right used. Phase-reverse, or
phase-missing could break the controllers.
Pull box
Note7
LW
GFI
WB
TB2
TB5
TB15
(L,N)
Power supply
(M1,M2)
(1,2)
TB1
1-phase
S
(R,S)
220-240V 50/60Hz
(Shield)
TB2 TB3
S
(Shield)
Transmission
booster
Note6
Note8
Note7
Note9
Pull box
LW
Note7
GFI
WB
TB2
TB5
TB15
(L,N)
Power supply
(M1,M2)
(1,2)
TB1
1-phase
S
(R,S)
220-240V 50/60Hz
(Shield)
TB2 TB3
S
(Shield)
Transmission
booster
Note8
Note9
Local switch
BC
OCP*3
<A>
<A>
25
25
25
25
32
32
40
40
means a screw terminal for wiring.
2
) must be less than 200m in length, while ME
2
) must be less than 10m in length. But transmission
2
in thickness.
TB2
TB5
TB15
(L,N)
(M1,M2)
(1,2)
S
E
(Shield)
MA R/C cable
2
S
0.3-1.25mm
(Shield)
2
(0.75~1.25mm
)
<=200m
Note5, Note11
MA R/C
TB2
TB5
TB15
(L,N)
(M1,M2)
(1,2)
S
E
(Shield)
ME R/C cable
S
(Shield)
2
0.3~1.25mm
2
(0.75~1.25mm
)
<=10m
Note5, Note11
ME R/C
Minimum Wire thickness
Wiring breaker
(NFB)
Power wire
<A>
<mm
2
>
30
4
30
4
30
4
40
6
2
,
2
) when the length
Earth wire
<mm
2
>
4
4
4
6
198

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pury-rp-yjm-b

Table of Contents