Computer Link Operation (Pr. 117 To Pr. 124, Pr. 338 To Pr. 340, Pr. 342) - Mitsubishi Electric FR-E 500 Instruction Manual

Hide thumbs Also See for FR-E 500:
Table of Contents

Advertisement

4.2.36 Computer link operation (Pr. 117 to Pr. 124 , Pr. 338 to Pr. 340 , Pr. 342 )
Pr. 117 "station number"
Pr. 118 "communication speed"
Pr. 119 "stop bit length"
Pr. 120 "parity check presence/absence"
Pr. 121 "number of communication retries"
Pr. 122 "communication check time interval"
Pr. 123 "waiting time setting"
Pr. 124 "CR•LF presence/absence selection"
Pr. 338 "operation command right"
Pr. 339 "speed command right"
Pr. 340 "link start mode selection"
2
Pr. 342 "E
PROM write selection"
Used to perform required settings for RS-485 communication between the inverter and
personal computer.
POINT
<To perform computer link operation>
! Set "100, 101, 110 or 111" in Pr. 119 to make NET mode communication.
! Presetting any value other than "0" in Pr. 122 enables communication between the
computer and inverter.
! When the communication option is fitted, NET mode communication cannot be
used if "100, 101, 110 or 111" is set in Pr. 119.
! When "1" is set in Pr. 340, the inverter is placed in the computer link operation
mode at power-on or inverter reset. (Note that it is overridden by the Pr. 79
"operation mode selection" setting.)
! Refer to page 13 for wiring.
<Operation mode>
1) PU mode communication (Pr. 119 = "0, 1, 10, 11")
Symbol
Switching Type
PU operation to
A
external operation
External operation
B
to PU operation
Switching by control
panel (FR-PA02-
02
unit (FR-PU04)
A
External
operation
B
Switching Method
Using the
key of the control panel (FR-PA02-
MODE
or
/
key of the parameter unit (FR-PU04)
PU
EXT
Using the
key of the control panel (FR-PA02-
MODE
or
/
key of the parameter unit (FR-PU04)
PU
EXT
117
PARAMETERS
)/parameter
PU
operation
4
)
02
)
02

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fr-e 520s ecFr-e 540 ec

Table of Contents