Reassembly - Hitachi CL 10D2 Technical Data And Service Manual

Cordless stud cutter
Table of Contents

Advertisement

(4) Second pinion section (Fig. 29)
Remove the Ball Bearing 6001VVCMPS2L [32] press-fitted into the Second Pinion [28] with a bearing puller.
Then the Washer [31] can be removed. Remove the Ball Bearing 609VVC2PS2L [24] in the same manner
and remove the Retaining Ring for D15 Shaft [25] with the stop ring pliers. Then the Washer [26] can be
removed. Remove the Needle [30] and the Idle Gear [29].

8-2. Reassembly

Reassembly can be accomplished by following the disassembly procedures in reverse. However, particular
attention should be given to the following items.
(1) Reassembly of the power supply unit section
Be sure to perform wiring connections as indicated in the wiring diagram below (Fig. 30).
Black
Red
[33]
The "+" side is indicated with a red mark on the Motor [33] (Fig. 31).
[28]
[24] [25] [26]
Brown
Blue
[13]
[14]
Fig. 30
[29]
[30]
[31]
--- 21 ---
[32]
Fig. 29
Red
Blue
[15]
"+" side
"---" side
Fig. 31
Black
Brown
[13]
Red mark

Advertisement

Table of Contents
loading

Table of Contents