Motorola PMP 320 Hardware Installation page 48

Table of Contents

Advertisement

Attach the AP assembly to a pole
Procedure 2-3
Install the top and bottom clamps to the pipe. Slide the clamp bracket on to
2
the carriage bolts. Slide on a 3/8-16 flat washer, 3/8-16 split lock washer and
a 3/8-16 hex nut to each carriage bolt.
NOTE
Tighten the hex nut to 10 ft-lbs (13.5 N.m) after the AP has been aligned to
the optimum downtilt position.
Connect the Ethernet cable from the AP to the CMM4 port controller. There
3
are up to 14 ports in one CMM4 switch, but only 8 ports on the CMM4
motherboard that can power up a radio. Ensure that surge suppression has
been installed for this connection. See the section on Surge Suppression
Information. Follow the site plan created by the network planner when
connecting cables to the CMM4 switch.
2-18
Attaching the AP assembly to a pole (Continued)
Align the AP setting the desired downtilt degree using the
inclinometer.
The network planner should provide the antenna pattern
information for the installation. The network is planned from
true north 0 degrees. Use a compass to ensure there is no
overlap of the antennas as they are installed.
Preliminary
Chapter 2: AP Hardware Installation
PMP320HDW2v1
Continued
JUL 2010

Advertisement

Table of Contents
loading

Table of Contents