• Align ground strips over screw holes.
5. Install
Chassis
Ground
Connections
• Replace screws removed in step 4 and
6. Install
• Attach ribbon cables between
Ribbon
Cables
• Be sure exposed wire portion of ribbon
between
Option
Cards
• Pull up collar (C) of ribbon cable socket,
• Repeat procedure for all ribbon cables.
• Remove terminal connector from
14
Strip with fewest contact points mounts
on cable side of chassis. Tabs on
grounding strips point toward outside
of chassis.
add additional screws and washers
provided, as necessary. Tighten to
0.9 Nm (8 in-lbs) using Torx T-20 screw
driver.
LonWorks control card and memory
card.
cable (A) is facing front of socket (B).
Do not remove blue insulation covering
end of ribbon cable.
insert cable and push collar closed.
IP20/NEMA 1 and IP54/NEMA 12
terminal block (D) and connect to
terminal block (E) at this time for ease
of access.
VLT
®
5000 / VLT
®
6000
Ground
Strips
MG.60.N1.22
- VLT is a registered Danfoss trademark
HVAC / VLT
®
8000 AQUA
(D)
(E)