GE c60 Instruction Manual page 250

Breaker protection system
Hide thumbs Also See for c60:
Table of Contents

Advertisement

SYSTEM SETUP
CHAPTER 5: SETTINGS
Figure 5-50: Dual breaker control logic (Sheet 2 of 2)
5
The breaker element has direct hard-coded connections to the IEC 61850 model as shown in the logic diagram. This allows
remote open/close operation of each breaker, using either CSWI or XCBR IEC 61850 logical nodes. IEC 61850 select-before-
operate functionality, local/remote switch functionality, along with blocking of open/close commands are provided. Note
that the dwell time for the IEC 61850 trip and close commands shown is one protection pass only. To maintain the close/
open command for a certain time, do so on the contact outputs using the "Seal-in" setting, in the Trip Output element, or in
FlexLogic.
5-124
C60 BREAKER PROTECTION SYSTEM – INSTRUCTION MANUAL

Advertisement

Table of Contents
loading

Table of Contents